Open main menu Close main menu

Resources and publications

Ngā rauemi me ngā tānga

Search guidescase notesopinionsreports and other information. Resources and publications can also be searched by date and other options. 

Use the search bar to make your search. Then use the filters to narrow down the results by resource type or topic. 

More information about the resource categories on this page
Search by keyword
  • Report on an unannounced follow-up inspection of Arohata Prison

    OPCAT reports
    In 2007, the Ombudsmen were designated one of the National Preventive Mechanisms (NPMs) under the Crimes of Torture Act (COTA), with responsibility for examining and monitoring the general conditions and treatment of detainees in New Zealand prisons.
  • Report on an unannounced follow-up inspection of Manawatu Prison

    OPCAT reports
    In 2007, the Ombudsmen were designated one of the National Preventive Mechanisms (NPMs) under the Crimes of Torture Act (COTA), with responsibility for examining and monitoring the general conditions and treatment of detainees in New Zealand prisons.
  • Report on an unannounced follow-up inspection of Rolleston Prison

    OPCAT reports
    In 2007, the Ombudsmen were designated one of the National Preventive Mechanisms (NPMs) under the Crimes of Torture Act (COTA), with responsibility for examining and monitoring the general conditions and treatment of detainees in New Zealand prisons.
  • Report on an unannounced inspection of Christchurch Men's Prison

    OPCAT reports
    Christchurch Prison is one of New Zealand’s larger prisons, and the largest in the South Island.
  • Request for agency peer review of Family Violence Death Review Committee draft annual report

    Case notes
    Release of free and frank comments made in the context of peer reviewing a draft annual report would inhibit the expression of similar comments in future—s 9(2)(g)(i) applied
  • Report on an unannounced inspection of Spring Hill Corrections Facility

    OPCAT reports
    Spring Hill Corrections Facility (the Prison) opened in 2007. The Prison accommodates male prisoners with security classifications ranging from minimum to high, as well as a growing remand population. Currently, it has an operating capacity of 1038.
  • Request for due diligence report, site visit reports and reference checks

    Case notes
    Section 9(2)(ba)(i) applies in part to the due diligence report and to the correspondence from supplier—public interest in accountability of Department for steps taken to satisfy itself regarding supplier’s performance—sections 9(2)(ba)(i) and 9(2)(g)(i) apply to information obtained from site visits, but not to the executive summary of the reports—public interest in accountability for decision to award contract—sections 9(2)(ba)(i) applies to reference checks—release would deter referees from providing full and complete information in future—public interest requires release of summary information about the reference checks
  • Report on an unannounced inspection of Hawke's Bay Regional Prison

    OPCAT reports
    Hawke’s Bay Regional Prison was opened in 1989. The Prison accommodates male prisoners with security classifications ranging from minimum to high, as well as a growing remand population.
  • Earthquake Commission should reimburse claimant’s travel costs when staff fail to attend meeting

    Case notes
    Earthquake Commission asked to reimburse claimants who travelled to Christchurch from Auckland to attend a meeting with EQC officials who failed to arrive—Ombudsman concluded EQC failed to provide the level of service required in the circumstances—EQC asked to offer ex gratia payment to compensate losses incurred and to apologise
  • Request for draft job sizing reports

    Case notes
    Reports formed an early stage of developing options for consideration and consultation— disclosure would likely inhibit the willingness of officials and consultants to tender a wide range of preliminary options, and to canvass issues in comprehensive written form, to the detriment of prudent and effective decision making
  • Earthquake Commission must follow legislation on claim lodgement time but Ombudsman considers law harsh

    Case notes
    Earthquake Commission (EQC) not unreasonable to decline a claim lodged out of time because this is required under the legislation—Ombudsman considers the law unreasonably harsh and it should be changed—EQC advised it will look into amending the law
  • Department of Corrections unreasonably declines computer access to inmate

    Case notes
    Access to computer suite in prison denied—Ombudsman found this unreasonable—Corrections agreed to reconsider the inmate’s request and to review criteria for use—also that computer facilities at prison be reviewed to ensure availability to prisoners who meet criteria for assistance with litigation
  • Department of Corrections not unreasonable to decline face to face interview between prisoner and journalist in particular case

    Case notes
    Prisoner requested face to face interview with journalist—request declined—Ombudsman noted journalist had offered to conduct interview by AVL, notwithstanding preference for face to face—Ombudsman concluded that on this basis Department had not acted unreasonably in this instance
  • Earthquake Commission’s handling of a claim unreasonable in the circumstances

    Case notes
    Whether the Earthquake Commission (EQC) had handled a claim for drapes and carpets in a reasonable manner—Chief Ombudsman found aspects of EQC’s handling of the matter to have been unsatisfactory
  • Request for CAA investigation report on Minister’s airport security breach

    Case notes
    Section 9(2)(a) OIA applied to information that would identify Minister’s staff—s 9(2)(a) did not apply to non-sensitive information about actions that occurred in a public place, or to the name of the Investigator—s 6(c) did not apply to information su
  • Request for draft terms of reference for an inquiry

    Case notes
    Draft terms of reference largely the same as publicly available final ones—release would not inhibit the future free and frank expression of opinion or provision of advice to the Prime Minister—s 9(2)(g)(i) did not apply
  • Request for evaluation and audit reports regarding extended supervision orders

    Case notes
    Evaluation report comprised largely academic material and statistical analysis—9(2)(g)(i) did not apply—audit report had been submitted to senior management but marked as draft—disclosure of majority not likely to prejudice future exchange of free and frank opinions—significant public interest considerations in favour of disclosure—audit report released with deletion of names and detailed findings relating to individual service providers
  • Request for briefing notes relating to state visits

    Case notes
    Inspection on conditions in order to identify the documents required provided means of resolving s 18(f) refusal
  • Request for DHB Commissioner’s draft work plan

    Case notes
    Release of draft work plan would likely result in reluctance by staff to draft and consult on document—components of plan, once confirmed, were to be included in the 2016/17 annual plan—s 9(2)(g)(i) provided good reason to withhold
  • Request for draft financial performance analysis

    Case notes
    Draft financial performance analysis prepared by Alma Consulting—s 9(2)(g)(i) did not apply— strong public interest in release
  • Request for communications between Chief of Defence Force and Prime Minister

    Case notes
    MP requested information on the restructuring of the NZDF—two letters from the Chief of Defence Force to the Prime Minister regarding draft reports withheld under s 9(2)(g)(i)—distinction between substantive comment about draft reports and minor editorial suggestions—substantive comments were recordings of Chief of Defence Force’s free and frank discussions with Prime Minister—part of Chief of Defence Force role is to advise Prime Minister but he would not have reduced comments to writing if he had thought they would be made public—free and frank comments needed to maintain constructive working relationship with Prime Minister—s 9(2)(g)(i) applied to substantive comments but not to remaining information
  • Request for early stage policy advice relating to paid parental leave

    Case notes
    Request for information relating to paid parental leave policy—information withheld to maintain collective ministerial responsibility, protect confidentiality of advice and free and frank exchange—in the circumstances no good reason to withhold
  • Request for minute from Chief of Air Staff to Chief of Defence Force

    Case notes
    Request for minute from Chief of Air Staff to Chief of Defence Force regarding return of aircraft to Samoa to uplift a civilian passenger—minute contained free and frank expressions of opinion—factual information and summary of opinions released—manner in which opinions expressed particularly frank—s 9(2)(g)(i) applied—public interest in release satisfied by release of summary