Open main menu Close main menu

Resources and publications

Ngā rauemi me ngā tānga

Search guidescase notesopinionsreports and other information. Resources and publications can also be searched by date and other options. 

Use the search bar to make your search. Then use the filters to narrow down the results by resource type or topic. 

More information about the resource categories on this page
Search by keyword
  • Report on an unannounced inspection of Whanganui Prison - 4 September 2018

    OPCAT reports
    The following report has been prepared in my capacity as a National Preventive Mechanism under the Crimes of Torture Act 1989 (COTA). My function under the COTA is to examine and make any recommendations that I consider appropriate to improve the treatment and conditions of detained persons in a number of places of detention, including prisons. This report examines the treatment and conditions of persons detained in Whanganui Prison.
  • Request for information about ERO review

    Case notes
    Section 9(2)(ba)(i) OIA applied to information obtained from participants in review—express obligation of confidence—release would be likely to prejudice the future supply of information by participants—it is in the public interest for ERO to receive co
  • Request for draft report prepared by PwC on Auckland Stadium

    Case notes
    Report refused because it was in draft form and commercially sensitive—parts of report withholdable however no basis for blanket withholding—strong public interest in release of report in part
  • Report on an unannounced follow-up inspection of Christchurch Women's Prison - 4 April 2018

    OPCAT reports
    In 2007, the Ombudsmen were designated one of the National Preventive Mechanisms (NPMs) under the Crimes of Torture Act (COTA), with responsibility for examining and monitoring the general conditions and treatment of detainees in New Zealand prisons.
  • Request for draft guidelines on religious instruction and observance in schools

    Case notes
    Officials still in the process of drafting—premature disclosure in advance of the planned public consultation process was not in the overall public interest
  • Report on an unannounced inspection of Arohata Upper Prison - 21 March 2018

    OPCAT reports
    The Upper Prison was facing considerable challenges. Resources, infrastructure and staffing were under pressure, which was compounded by the geographical separation from the administrative centre at Tawa. Day-to-day operating systems and arrangements for dealing with women were not fully embedded. Reception and induction processes were poor, and information for foreign prisoners was not available. Significant delays in access to personal property were a source of frustration for many women, reflected in the growing number of complaints and misconducts.
  • Request for draft reports prepared by EY on Information Services

    Case notes
    Draft reports were in fact final reports—some information publicly available—negotiations had been concluded—neither s 7(2)(c)(ii) nor s 7(2)(i) apply—significant public interest in release to promote transparency of Council’s decision making processes and accountability for expenditure of ratepayer money
  • Request for statistics on allegations of assault by Corrections staff

    Case notes
    Requirements of Operations Manual meant source information to answer request should be held—manual compilation is not creation—s 18(g) does not apply—unreasonable to rely on s 18(f) when the fundamental difficulty in providing the information was down to the Department’s own administrative lapses
  • Department of Corrections staff to follow legislative requirements when segregating inmate

    Case notes
    Department of Corrections held prisoner in Management Unit without following required procedure—segregation legislation and regulations are clear and prescriptive
  • Immigration New Zealand’s decision to issue Deportation Liability Notice unreasonable in circumstances

    Case notes
    Immigration New Zealand (INZ)’s decision to issue a Deportation Liability Notice (DLN) was unreasonable—compliance officer inferred situation that complainant was then not given an opportunity to explain—Ombudsman sustained complaint—INZ restored immigration status to complainant with open conditions
  • Request for Skypath business case and procurement plan

    Case notes
    Releasing business case and procurement plan would unreasonably prejudice the commercial position of the private partner in a public private partnership—withholding strengths and weaknesses of negotiating position necessary to enable Council to carry on negotiations without prejudice or disadvantage—ss 7(2)(b)(ii), 7(2)(c)(i), 7(2)(i) apply
  • Request for draft internal review of International Visitor Survey

    Case notes
    Internal review still in draft form—redacted comments comprised preliminary views of individual within agency—s 9(2)(g)(i) applied—no overriding public interest in disclosure
  • Request for handwritten comments on draft walking and cycling strategy

    Case notes
    Release would inhibit willingness of Council staff to provide free and frank opinions on drafts circulated by colleagues, or to test the content and recommendations of such documents, which would undermine the accuracy and value of the material that eventuates—s 7(2)(f)(i) applies
  • Request for Pre-Cabinet précis briefings

    Case notes
    Disclosure of short and incisive pre-Cabinet briefings and risk assessments would inhibit future expression of free and frank opinions
  • Request for draft ‘Alternatives Paper’ prepared by consultants on CBD rail link

    Case notes
    Release would inhibit exchange of drafts and views between staff and consultants, which would undermine the drafting process—s 7(2)(f)(i) applied—public interest met by the release of the final report and the peer reviews by relevant agencies
  • Request for literature review on youth desistance

    Case notes
    Draft review provided to successful tenderer as starting point for an external research project— information not in the nature of free and frank opinions—disclosure would not undermine interest in s 9(2)(g)(i)—release accompanied by contextual statement
  • Request for transcripts of post-Cabinet press conferences

    Case notes
    Prime Minister’s office wanted to compare draft transcript with audio recording to check for errors—‘substantial collation or research’ does not encompass a quality assurance check of that nature—10 hours work did not amount to ‘substantial collation or research’
  • Request for minutes of Council workshops

    Case notes
    Request for minutes of Unitary Plan Political Working Party—minutes related to Council ‘workshops’—s 7(2)(f)(i) applied in part—minutes could be disclosed in part without inhibiting people from contributing to workshops in future
  • Request for draft report on NZX compliance with general obligations

    Case notes
    Release would inhibit the free and frank expression of opinions by officials during the drafting process, and the exchange of opinions between the NZX and FMA—it is in the interests of the ‘effective conduct of public affairs’ for the review process to be robust and conducted in a manner that supported the FMA’s main objective of promoting and facilitating the development of fair, efficient and transparent markets—s 9(2)(g)(i) applied
  • Request for handwritten notes of discussions between MFAT Chief Executive and Minister of Foreign Affairs

    Case notes
    Request for handwritten notes of Chief Executive’s discussions with Minister—confidentiality is necessary to protect the ongoing effectiveness and conduct of the relationship—public interest in disclosure not sufficient to outweigh s 9(2)(g)(i) interest
  • Request for documentation about ‘Ageing in Place’ contract

    Case notes
    Release of detailed proposals and component prices would have an adverse effect on tenderers’ responses to future tenders issued by the DHB, which would damage the public interest—s 9(2)(ba)(ii) OIA applies—release would have an inhibiting effect in future on the quality of the documentation associated with the DHB’s contract negotiations and tender evaluation, which would be prejudicial to the future conduct of such tenders—s 9(2)(g)(i) applies
  • Request for recruitment consultant expenditure

    Case notes
    No cost code specifically and solely for recruitment fees—information could not be made available without ‘substantial collation or research’—release of other information resolved the complaint
  • Request for discussions between Ministers on business before Cabinet

    Case notes
    Discussions between Ministers on business before Cabinet imbued with a presumption of confidentiality—s 9(2)(g)(i) provides good reason to withhold undocumented discussions
  • Request for draft public discussion document regarding auditor regulation

    Case notes
    Close-to-final draft containing limited evidence of opinion material—risk of public misunderstanding of the status of this draft document did not justify withholding and could be addressed by disclosure of contextual information—strong public interest in transparency of the policy development process given full-scale public consultation no longer intended
  • Immigration New Zealand's error in granting permit in one case raises no legitimate expectation for another applicant in same situation

    Case notes
    Immigration New Zealand (INZ) declined application for a graduate work permit because applicant did not meet the criteria applicable at the time—complainant claimed decision unreasonable because other applicants in his situation were granted permits—Ombudsman found no evidence that INZ made a practice of granting graduate work permits outside the terms of the policy as a matter of course and failure (to correctly apply policy) in one case should not raise legitimate expectations for other applicants
  • Department of Corrections required to review process for media contact with inmates

    Case notes
    Access to prison inmates by the news media—conflict between procedural manual and communications policy—policy to be reviewed to ensure consistency with procedures
  • Department of Corrections protocol with Ombudsman regarding death in custody

    Case notes
    Death in custody—application of Protocol between Department of Corrections and Office of the Ombudsmen—issues arising from monitoring departmental investigation—need for improved communication, videotaping, fire safety and emergency procedures
  • Request for names of ‘eminent New Zealanders’ consulted during preparation of Intelligence and Security Agencies Bill

    Case notes
    Request for names of ‘eminent New Zealanders’ who were part of the consultative process in preparing the Intelligence and Security Agencies Bill—request refused under s 9(2)(g)(i) —individuals consulted—in respect of those who advised that disclosure would inhibit them from giving free and frank advice to the Government in future, section 9(2)(g)(i) applied—need to withhold outweighed by countervailing public interest
  • Prison unnecessarily holds inmates in secure unit

    Case notes
    Placement of minimum secure inmates in maximum security conditions