Open main menu Close main menu

Resources and publications

Ngā rauemi me ngā tānga

Search guidescase notesopinionsreports and other information. Resources and publications can also be searched by date and other options. 

Use the search bar to make your search. Then use the filters to narrow down the results by resource type or topic. 

More information about the resource categories on this page
Search by keyword
  • Earthquake Commission’s handling of a claim unreasonable in the circumstances

    Case notes
    Whether the Earthquake Commission (EQC) had handled a claim for drapes and carpets in a reasonable manner—Chief Ombudsman found aspects of EQC’s handling of the matter to have been unsatisfactory
  • Request for CAA investigation report on Minister’s airport security breach

    Case notes
    Section 9(2)(a) OIA applied to information that would identify Minister’s staff—s 9(2)(a) did not apply to non-sensitive information about actions that occurred in a public place, or to the name of the Investigator—s 6(c) did not apply to information su
  • Request for draft terms of reference for an inquiry

    Case notes
    Draft terms of reference largely the same as publicly available final ones—release would not inhibit the future free and frank expression of opinion or provision of advice to the Prime Minister—s 9(2)(g)(i) did not apply
  • Request for evaluation and audit reports regarding extended supervision orders

    Case notes
    Evaluation report comprised largely academic material and statistical analysis—9(2)(g)(i) did not apply—audit report had been submitted to senior management but marked as draft—disclosure of majority not likely to prejudice future exchange of free and frank opinions—significant public interest considerations in favour of disclosure—audit report released with deletion of names and detailed findings relating to individual service providers
  • Request for briefing notes relating to state visits

    Case notes
    Inspection on conditions in order to identify the documents required provided means of resolving s 18(f) refusal
  • Request for information about DHB’s dispute with South Link Health

    Case notes
    Releasing statement of claim in breach of confidentiality agreement would disadvantage the DHB by diminishing trust and goodwill between the parties—releasing report would disadvantage the DHB by assisting the other party to counter DHB’s position—public interest in disclosure outweighed the need to withhold the statement of claim but not the report
  • Request for information about dispute between South Link Health and Southern District Health Board

    Case notes
    Good reason to withhold information that would reveal negotiating position and strategy or further deteriorate the relationship between the parties—s 9(2)(j) does not apply to some factual information and information that was known to the other party to the negotiation
  • Request for DHB Commissioner’s draft work plan

    Case notes
    Release of draft work plan would likely result in reluctance by staff to draft and consult on document—components of plan, once confirmed, were to be included in the 2016/17 annual plan—s 9(2)(g)(i) provided good reason to withhold
  • Request for draft financial performance analysis

    Case notes
    Draft financial performance analysis prepared by Alma Consulting—s 9(2)(g)(i) did not apply— strong public interest in release
  • Request for CERA property valuation reports

    Case notes
    Much of the information already available to the requesters—disclosing the remaining information about how the valuations were reached would not prejudice or disadvantage CERA in negotiations with property owners, but make the negotiations more robust with both sides fully informed—strong public interest in disclosure to address power disparity between negotiating parties—s 9(2)(j) does not provide good reason to withhold
  • Request for draft advice on establishing a reserve

    Case notes
    Release of early and annotated advice would inhibit the free and frank exchange of opinions between officials drafting advice—general public interest in transparency had been met by disclosure of technical papers that formed the basis of the advice to the Minister, together with the final advice paper
  • Request for draft ministerial and chief executive correspondence

    Case notes
    Release of draft ministerial and chief executive correspondence would inhibit the free and frank expression opinions—s 9(2)(g)(i) applies
  • Department of Corrections reasonable to seek removal of prisoner from study course in some circumstances

    Case notes
    Whether the Department of Corrections was reasonable to request the tertiary institution to remove a prisoner from a course at a polytechnic—Ombudsman found Department’s decision to have been reasonable in part
  • Earthquake Commission not unreasonable to decline payment for engineering reports commissioned by property owner

    Case notes
    Whether it was reasonable for EQC to decline payment for two engineering reports—Ombudsman considered that EQC had not acted unreasonably in this respect
  • Request for costing and liability information concerning the grounding of the MV Rena

    Case notes
    Release of information about costs incurred in responding to the grounding would give advance notice of the Crown’s negotiating position—s 9(2)(j) applies but not to information that was known to both parties and in the public domain
  • Request for details of risk management processes

    Case notes
    Request for details of risk management processes—relevant documents provided apart from the ‘risk register’—register consisted of free and frank expressions of opinion—release might undermine risk management strategy—public interest met by release of Risk Management Policy
  • Request for planning package for health and disability services

    Case notes
    Request for CHE Planning Package for health and disability services in Otago—request refused by Southern Regional Health because of prejudice to negotiations—identification and assessment of countervailing public interest considerations favouring disclosure
  • Request for information relating to divestment of Crown shares in Electricity Corporation

    Case notes
    Request for information relating to divestment by Crown of shares in Electricity Corporation (ECNZ)—request refused—ECNZ removed from Schedule 1 to Official Information Act during course of investigation—investigation discontinued
  • Department of Conservation resolves impasse concerning ivory-key piano held by New Zealand Customs

    Case notes
    Refusal to release piano imported from United Kingdom—family heirloom from 1920s—need for approval of Department of Conservation under CITES because of ivory content—conflict between New Zealand legislation implementing CITES and European Community Regulations—impasse resolved by acceptance of statutory declaration by family—conflict to be raised with CITES Secretariat
  • Earthquake Commission can impose excess levy under the regulations

    Case notes
    Two adjoining properties affected by a landslide – EQC levied an excess on both properties in accordance with the Earthquake Commission Act 1993 (Regulations 1993, reg 4(1)(b)—the Ombudsman concluded EQC was entitled to impose the excess
  • Request for names of ‘eminent New Zealanders’ consulted during preparation of Intelligence and Security Agencies Bill

    Case notes
    Request for names of ‘eminent New Zealanders’ who were part of the consultative process in preparing the Intelligence and Security Agencies Bill—request refused under s 9(2)(g)(i) —individuals consulted—in respect of those who advised that disclosure would inhibit them from giving free and frank advice to the Government in future, section 9(2)(g)(i) applied—need to withhold outweighed by countervailing public interest
  • Prison unnecessarily holds inmates in secure unit

    Case notes
    Placement of minimum secure inmates in maximum security conditions
  • Earthquake Commission not required to cover buildings under construction in the event of a landslide

    Case notes
    Earthquake Commission and Insurer both decline cover for half-built structure on private property, damaged following a landslide—still being under construction meant the building was not being used for its intended purpose and EQC’s decision in this respect was correct—Ombudsman advised that the complainant could refer the matter back to the insurer for a reconsideration and the Insurer in this case took a liberal view of what had been an unusual event and settled the claim—case indicates the need to obtain cover for landslip while a building is under construction